QUENDON HALL BLOG

Parklands Beautiful New Marquee

mm

by Quendon Hall

The snow and freezing weather made the initial ground works quite problematic, and slowed the start of the project down. Once a solid base had been created and the sub floor laid it was then time to start erecting the frame, then pull all the canvas sheets through the frame, until finally there was a water tight structure. Next all the floor had to be laid ,the double glazed bi-fold doors installed, and 100’s metres of electrical cable routed around the frame. Once all this was complete the linings could be hung, the new chandeliers put in place. Finally after four very very long weeks it now looked like a fabulous place to have a wedding.
Well done to the whole team that made this possible!!!

Marquee Video full from The Tabor Group on Vimeo.

close heart-balloons icon_email icon_map icon_telephone icon_write sticker_blue_10 sticker_blue_1000 sticker_blue_3800 sticker_blue_4000 sticker_blue_4500 sticker_blue_500 sticker_blue_5000 sticker_blue_6000 sticker_blue_7000 sticker_blue_discount_package sticker_blue_discount_price sticker_blue_early sticker_blue_limited sticker_blue_new sticker_blue_reduced sticker_blue_sale sticker_blue_special sticker_pink_10 sticker_pink_1000 sticker_pink_3800 sticker_pink_4000 sticker_pink_4500 sticker_pink_500 sticker_pink_5000 sticker_pink_6000 sticker_pink_7000 sticker_pink_discount_package sticker_pink_discount_price sticker_pink_earlybird sticker_pink_limited sticker_pink_new sticker_pink_reduced sticker_pink_sale sticker_pink_special tail-right